Pathline Project Planner
io.github.theluckystrike/critical-path
Project planning tool for critical path calculations.
unverified activityno licencemedium
20.0
/ 100 activity
rank #37,981
How this score was reached
Every point is accounted for below. The weights are published on the methodology page and come from the same code that computes them.
recency
0 / 35
No GitHub repository data available, so push recency could not be verified.
responsiveness
0 / 20
No GitHub repository data available, so issue activity could not be assessed.
cadence
15 / 15
Registry entry updated 11 days ago, within the 90-day release window.
community
0 / 15
No GitHub repository data available, so community size could not be measured.
metadata
5 / 15
Publisher metadata has no detected licence, a substantive description, no repository link.
Risk flags
Static observations from published metadata. Nothing is installed or executed, and these are deliberately kept out of the score above.
medium
No source repository declared
The registry entry links to no public source repository.
The server may still be reputable, but nobody outside the publisher can review what it does.
Score over time
2 readings, oldest first. Latest 20.0.
Registry record
- Repository
- none declared
- Website
- https://critical-path.zovo.one/
- Version
- 1.0.0
- Licence
- none detected
- Activity data
- Not available — the repository is not on GitHub, or could not be read. Activity signals score zero rather than being guessed at.
- Remote endpoints
- streamable-http: https://critical-path.zovo.one/mcp
- Registry updated
- First indexed
Something wrong here? This index reads public registry and GitHub data; if a record is stale or misattributed, email contact@klars.ai.